The Stillwater Central School District is aware of the planned power outage from 1-3 p.m. on April 8 conducted by New York State Electric and Gas (NYSEG).
While this outage will affect a majority of the town and village, the district’s school buildings will dismiss early as previously planned.
Each school will be dismissed at the following times on Monday, April 8:
- MS/HS dismissal: 12:19 p.m.
- Elementary dismissal: 1:19 p.m.
- UPK will dismiss at 1:00 p.m.
- Parent pick up will begin at 1:05 p.m.
- No PM BOCES
- No PM SUNY Adirondack ECHS program